English Customer Service: 1-844-FIRMAN1Page 13
10. Allow generator to run at no load for few
minutes upon each initial start-up to permit
engine and generator to stablize.
Starting the Generator (Remote Start)
YOUR REMOTE CONTROL IS ALREADY
PROGRAMMED IN
FACTORY FOR YOUR CONVENIENCE. AND IT IS
READY TO START THE GENERATOR.
If the remote control is replaced, then you will
need to go through programming procedure in
"Remote Control Programming" section.
1. Before starting the generator, check for
loose or missing parts and for any damage
which may have occurred during shipment.
2. Check oil level and fuel.
3. Disconnect all electrical loads from the
generator. Never start or stop the generator
with electrical devices plugged in or turned on.
4. Turn the
fuel valve to the “ON”
(l)position.
5. Flip the
engine switch to the
“RUN”(l) position.
6. Flip the
battery switch to the
"ON"(l) position.
7. Push and release the ''START'' button on
the remote control.
The generator will turn over for 3 to 5 seconds and
start.
An engine warmup delay is programmed into the
remote start cycle. After the generator is running,