Quick Start
Unpacking 4
4-3
Caution
Read Chapter 6 entitled BATH USE before placing the bath in
service.
This chapter gives a brief summary of the steps required to set up and operate the bath.
This should be used as a general overview and reference and not as a substitute for the
remainder of the manual. Please read Chapter 5, Installation, through Chapter 8, General
Operation, carefully before operating the bath.
Unpacking
Unpack the bath carefully and inspect it for any damage that may have occurred during
shipment. If there is shipping damage, notify the carrier immediately. Verify that all
components are present:
• 7341 Bath
• Access Hole Cover
• Fluid Expansion Reservoir with Cover
• User's Guide
• RS-232 Cable
• Report of Test
• Drain Valve
• 9930 Interface-it Software and User's Guide
• Tipping Prevention Bracket, including mounting hardware for wood or concrete floor
• 2019-DCB Kit, Liquid-in-Glass (LIG) Adapter and Carousel (optional)
• 2069 Scope, Liquid-in-Glass (LIG) with mounts (optional)
If you are missing any item, please call an Authorized Service Center. To locate an
Authorized Service Center near you see Authorized Service Centers in Chapter 1.
Set Up
Warning
The instrument is equipped with a soft cutout (user settable
firmware) and a hard cutout (set at the factory). Check the flash
point, boiling point, or other fluid characteristic applicable to
the circumstances of the instrument operation. Ensure that the
soft cutout is adjusted to the fluid characteristics of the
application. As a guideline, the soft cutout should be set 10°C
to 15°C below the flash point of the bath fluid. See Heat
Transfer Fluid in Chapter 8, for specific information on bath
fluids and Cutout in Chapter 10.
Set up of the bath requires careful unpacking and placement of the bath, filling the bath
with fluid, and connecting power. Consult Chapter 5, Installation, for detailed
instructions for proper installation of the bath. Be sure to place the bath in a safe, clean
and level location. Refer to Tipping Prevention Bracket in Chapter 5, for Tipping
Prevention Bracket installation instructions.
Fill the bath tank with an appropriate liquid. Be sure to select the correct fluid for the
temperature range of the calibration. Bath fluids should be selected to operate safely with
adequate thermal properties to meet the application requirements. For operation at