EasyManua.ls Logo

Foundry Networks EdgeIron 2402CF - Equipment Checklist; Package Contents; Optional Rack-Mounting Equipment

Default Icon
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
I
NST A L LI NG
THE
S
WI TCH
4-2 © 2003 Foundry Networks, Inc. February 2003
suppressor is recommended.
Equipment Checklist
After unpacking the switch, check the contents to be sure you
have received all the components. Then, before beginning the
installation, be sure you have all other necessary installation
equipment.
Package Contents
•24-Port Fast Ethernet Switch
•Four adhesive foot pads
Bracket Mounting Kit containing two brackets and four
screws for attaching the brackets to the switch
Power Cord
RS-232 console cable
•Stacking Cable
CD-ROM containing installation guide and user guide
Optional Rack-Mounting Equipment
If you plan to rack-mount the switch, be sure to have the
following equipment available:
Four mounting screws for each device you plan to install in a
rack—these are not included
A screwdriver (Phillips or flathead, depending on the type of
screws used)

Table of Contents

Related product manuals