EasyManua.ls Logo

Franke A200 - Commissioning the Coffee Machine; Initial Commissioning of the A200; Daily Commissioning Procedure

Franke A200
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
560
200
6050
613
60
i
Installation and technical data
Page 19
Prepare a stable, ergonomic surface (min. load capacity: 100 kg or 220 lb).
The operator panel should be no higher than at eye level.
Minimum clearances:
To the rear wall: 50 mm
Upwards: 200 mm (filling and removal of coffee bean hopper)
To the right: 60mm (for removal of the brewing unit)
To the left: 60mm (for opening the refrigeration unit)
Adjustable feet (optional) can be used to compensate for unevenness or
height differences.
If optional add-on units are installed, up to an additional 330mm of width
may be required.
Total height
40 mm 600mm+40mm=640mm
100 mm 600mm + 100mm=700mm
Adjustable feet
Installation dimensions of the A200 FoamMasterDimensions of the A200 FoamMaster
60540
70-180
604
613
270 340

Related product manuals