Page #16 background image
16
Wall Plenum Installation
Note: The wall plenum is not designed to carry any structural load. A load bearing header must be built above
the rough opening.
1. Prepare the rough opening. The rough opening should be lined with metal or wood. The plenum will warp if
sealed against concrete or brick.
2. Dry t the outside plenum half into the rough opening and check the t and level.
3. Remove the outside plenum half, ash the rough opening to ensure proper t and level.
4. Pre-installing the exterior louver (VPAL2) as shown above is optional (See Page 17).
5. Apply sealant to the outside plenum half and insert into the rough opening to ensure a water-tight seal.
Ensure that the outside plenum half is securely attached to the framed opening.
Step 1 - Outside Wall Plenum Half

Other manuals for Friedrich VERT-I-PAK Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Friedrich VERT-I-PAK Series and is the answer not in the manual?

Friedrich VERT-I-PAK Series Specifications

General IconGeneral
BrandFriedrich
ModelVERT-I-PAK Series
CategoryHeat Pump
LanguageEnglish

Related product manuals