EasyManua.ls Logo

Fronius Primo 8.2-1 - Opening and Closing the Housing; Safety; Opening the Housing

Fronius Primo 8.2-1
164 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
117
EN-US
Opening and closing the housing
Safety
A safety inspection must be carried out after the replacement, modification, maintenance
or repair of a component (see section "Safety Inspection").
Opening the
housing
Dismantling
Set the DC disconnector (1) to OFF.
Loosen 2 x 5x18 mm TX25 (2) screws
until the DATCOM lid (3) can be remo-
ved
If present disconnect the data commu-
nication lines
Loosen 2 x 5x25 mm TX25 (4) screws
and thereby break the connection bet-
ween the inverter and the wall bracket.
WARNING! An electric shock can be fatal. Before opening the device
- Set power switch to - O -
- Disconnect the device from the grid
- Attach a clear warning sign advising others not to switch the power source
back on
- Use a suitable measuring instrument to ensure that electrically charged com-
ponents (e.g., condensers) are discharged
WARNING! An electric shock can be fatal. Danger of residual voltage from ca-
pacitors. Wait until the capacitors have discharged. Discharge takes 6 minutes.
Additional information on discharge time can be found in the operating instruc-
tions and in the safety information on the inverter.
NOTE! Requirements for electrical installations may be subject to national stan-
dards and regulations, and these must be followed accordingly.
(1)
(2)
(2)(3)
1
2
(4)(4)
3
4

Table of Contents

Other manuals for Fronius Primo 8.2-1

Related product manuals