Innovation · Expertise · Agility
1.2.2
Checking
the
Installation
S
ite.
S3410
switch
must
be
installed
indoors.The
installation
site
must
meet
the
following
requirements
Item
Requirement
Cleanliness
The
device
must
be
installed
in
a
clean,
dry,
and
well
ventilated
standard
equipment
room
with
controllable
temperature.
Dust
proofing
Dustproof measures must be taken in the site. Dust will cause electrostatic discharges on the chassis and
affect connections of metal connectors and joints. This shortens service life of the device and may cause
failures of the device.
Temperature
and
humidity
The equipment room must be free from leaking or dripping water, heavy dew, and damp. The temperature
and humidity in the installation site must be within specifications. For the operating temperature and
relative humidity ranges required by the device, see the device specifications. If the relative humidity
exceeds 70%, using dehumidifiers or dehumidifying air conditioners is recommended.
Corrosive gases
avoidance
The installation site must be free from acidic, alkaline, or corrosive gases.
Hardware Installation and Parts Replacement
Switch Hardware Installation and Maintenance Guide
5
1.2.3
Mounting
the
Cabinet
or
rack
S3410 switchmustbeinstalledindoors.Theinstallationsitemustmeetthefollowingrequirements
•
All
expansion
bolts
for
fastening
the
cabinet
base
to
the
ground
should
be
installed
and
tightened
in
sequence
from
bottom
to
up
(large
flat
washer
,
spring
washer
,
and
nut
),
and
the
installation
holes
on
the
base
and
the
expansion bolts
are
aligned
.
•
The
installed
cabinet
is
not
movable
after
installation.
•
The
installed
cabinet
is
vertical
to
the
ground.
•
When
multiple
cabinets
are
placed
side
by
side
in
the
equipment
room,
they
should
be
aligned
with
each
other
an
error
,leaving
less
than
5mm
(0.20
in.)
•
The
front
and
rear
doors
of
the
cabinet
should
be
installed
to
allow
you
open
and
close
them
smoothly
locks
should
work
normally,
and
all
keys
should
be
complete
.
•
There
should
be
no
unnecessary
and
informal
labels
inside
the
cabinet
and
on
service
modules .Filler
panels
are
installed
in
empty
slots
•
The
screws
in
the
cabinet
should
be
fastened
tightly
and
be
of
the
same
model.
•
The
switch
is
securely
installed,
and
the
screws
on
the
panel
should
be
fastened
tightly.
•
All
wiring
outlets
at
the
top
and
bottom
of
the
cabinet
should
be
installed
with
rodent
-resistant
nets
wit
openings
of
no
more
than
15mm
(0.59
in.)
in
diameter
to
prevent
rodents
and
other
small
animals
from
entering
the
cabinet
•
An
anti-static
wrist
strap
should
be
provided
in
the
cabinet.