EasyManuals Logo
Home>FS>Switch>S3410 Series

FS S3410 Series User Manual

FS S3410 Series
19 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
Installation Requirements
Before you begin the installation, make sure that you have the followings:
Category 5e or higher RJ-45 Ethernet cables, ber optical cables and console cable for
connecting network devices.
Phillips screwdriver.
Standard-sized, 19" wide rack with a minimum of 1U height available.
Site Environment:
Do not operate it in an area that exceeds an ambient temperature of 50°C.
The installation site must be free from leaking or dripping water, heavy dew, and humidity.
Ensure rack and working platforms are well earthed.
Standard-sized, 19" wide rack with a minimum of 1U height available.
Be sure that the switch is level and stable to avoid any hazardous conditions.
Do not install the equipment in a dusty environment.
PoE
Status M1 M2 PWR1 PWR2 PoE
1 2
2
3
4
5
6 7 8
9 10
11 12
12 14 24
13 14 15 16 17 18 19 20 21 22
23 24
Green=1000M Yellow=10/100MOn=Link Flashing=ACT
PoE LED:Green=Good Supply Yellow=Over Load
Console
25F
26F
27F
RG-S2910-24GT2XS-UP-E
SFP+

Other manuals for FS S3410 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the FS S3410 Series and is the answer not in the manual?

FS S3410 Series Specifications

General IconGeneral
BrandFS
ModelS3410 Series
CategorySwitch
LanguageEnglish

Related product manuals