Installation Requirements
Before you begin the installation, make sure that you have the followings:
Category 5e or higher RJ-45 Ethernet cables, ber optical cables and console cable for
connecting network devices.
Phillips screwdriver.
Standard-sized, 19" wide rack with a minimum of 1U height available.
Site Environment:
Do not operate it in an area that exceeds an ambient temperature of 50°C.
The installation site must be free from leaking or dripping water, heavy dew, and humidity.
Ensure rack and working platforms are well earthed.
Standard-sized, 19" wide rack with a minimum of 1U height available.
Be sure that the switch is level and stable to avoid any hazardous conditions.
Do not install the equipment in a dusty environment.
PoE
Status M1 M2 PWR1 PWR2 PoE
1 2
2
3
4
5
6 7 8
9 10
11 12
12 14 24
13 14 15 16 17 18 19 20 21 22
23 24
Green=1000M Yellow=10/100MOn=Link Flashing=ACT
PoE LED:Green=Good Supply Yellow=Over Load
Console
25F
26F
27F
RG-S2910-24GT2XS-UP-E
SFP+