6. SYSTEM DESIGN
Chamber installation
Fit the four-sided holes of the chamber together with the hook fittings of the Fresh Air Intake
Kit (in two places), and secure the attached chamber in place with screws provided.
Ø100 (3-15/16)
hook fittings
screw x 2
Unit : mm (inch)
When using the “UTZ-KXGC” kit for high humidity, please first cut off and remove the heat ●
insulation as shown in the figure.
Please install the kit for high humidity according to the installation instruction sheet provided. ●
Cut off
80 (3-5/32)
30 (1-3/16)
- (06 - 123) -
SYSTEM
DESIGN
SYSTEM
DESIGN