EasyManua.ls Logo

Fujitsu ASTG30KMTC - Defrost Operation Flowchart

Fujitsu ASTG30KMTC
199 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Flowchart
The defrost proceed by integrating operation time, outdoor temperature, and outdoor heat ex-
changer temperature as follows.
Compressor OFF
Outdoor fan motor OFF
30 sec later four - way valve OFF
35 sec later compressor ON (30)
36 sec later compressor ON (34)
(Not defrosted for 10 minutes)
Heating operation start : Compressor ON
Outdoor heat exchanger temperature:
Over
+13°
C (30)
+12°C (34)
or
Compressor ON time: Maximum 15 minutes
Defrost end
Compressor
integrating
operation:
Over 22 min.
Outdoor
heat exchanger
temperature:
Below - 9°C
Outdoor
heat exchanger
temperature:
Below - 5°C
Compressor
integrating
operation:
Over 35 min.
2nd and later defrost
Integrating defrost
(Constant monitoring)
Defrost Indicator:
[Operation lamp]
7 sec ON / 2 sec OFF
Defrost start
Tn-Tn10 < - 5deg
Tn-Tnb < - 2deg
However, Tn ≤ -6
°C
(30)
(34)
Compressor
OFF count :
40 times
(Less than 10min.)
1st defrost
Compressor
integrating
operation:
Over 62 min.
Compressor
integrating
operation:
Over 240 min.
Outdoor
heat exchanger
temperature:
Below - 3°C
Compressor
integrating
operation:
Over 215 min.
Outdoor
heat exchanger
temperature:
Below - 5°C
Tn ≤ -10°C
- (04-18) - 6. Defrost operation control
CONTROL AND
FUNCTIONS
CONTROL AND
FUNCTIONS

Table of Contents

Related product manuals