EasyManua.ls Logo

GE 850 - Current Demand; Power Demand

GE 850
664 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11–14 850 FEEDER PROTECTION SYSTEM – INSTRUCTION MANUAL
CURRENT DEMAND CHAPTER 11: METERING
Current Demand
NOTE
NOTE:
The number of Current Demand supported is Order Code dependent.
The relay measures Current Demand on each phase, and three phase Demand for real,
reactive, and apparent power. These parameters can be monitored to reduce supplier
Demand penalties or for statistical metering purposes. Demand calculations are based on
the measurement type selected under
Monitoring > Functions > Demand. For each
quantity, the relay displays the Demand over the most recent Demand time interval, the
maximum Demand since the last maximum Demand reset, and the time and date stamp
of this maximum Demand value. Maximum Demand quantities can be reset to zero at
Records > Clear Records > Max Current Demand.
Path: Metering > Current Demand 1(X)
Cur1 Reset Demand D/T MM/DD/YY 00:00:00
Cur1 Ph A/B/C Demand
Range: 0.000 to 12000.000 A
Cur1 Max Ph A/B/C Demand
Range: 0.000 to 12000.000 A
Cur1 D/T Ph A/B/C Demand MM/DD/YY HH:MM:SS
Power Demand
This menu shows the real, reactive, and apparent power demands along with their
maximums. The maximums can be cleared by resetting them from
Records > Clear
Records
or from Device > Clear Records .
Path: Metering > Power Demand 1(X)
Reset Dmd Date/Time MM/DD/YY 00:00:00
Real Demand (Real Dmd)
Range: 0.0 kW to 214748364.7 kW
MMax Real Dmd
Range: 0.0 kW to 214748364.7 kW
Date/Time Real Dmd MM/DD/YY 00:00:00
Reactive Demand (Reactive Dmd)
Range: 0.0 kvar to 214748364.7 kvar
Max Reactive Dmd
Range: 0.0 kvar to 214748364.7 kvar
D/T Reactive Dmd MM/DD/YY 00:00:00
Apparent Demand (Apparent Dmd)
Range: 0.0 kVA to 214748364.7 kVA
Max Apparent Dmd
Range: 0.0 kVA to 214748364.7 kVA
D/T Apparent Dmd MM/DD/YY 00:00:00

Table of Contents

Related product manuals