EasyManuals Logo

GE Corometrics 172 Service Manual

GE Corometrics 172
248 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #210 background imageLoading...
Page #210 background image
9-8 170 Series Monitor Revision C
2000947-004
Maintenance: Preventative Maintenance Inspection
Unit to Primary Leakage
1. Configure a leakage tester to perform a unit AC line leakage test.
2. Turn ON the monitor using the monitor’s
On/Standby button.
3. Verify the following:
<300 µA
(132–253 VAC, or at the line voltage at your facility +10%)
4. Record the primary leakage for the following conditions:
Table 9-1. Unit to Primary Leakage Conditions
Neutral Ground Power (Polarity)
__________ Closed __________ Closed __________ Normal
__________ Closed __________ Open __________ Normal
__________ Closed __________ Open __________ Reversed
__________ Closed __________ Closed __________ Reversed
__________ Open __________ Closed __________ Normal
__________ Open __________ Closed __________ Reversed

Table of Contents

Other manuals for GE Corometrics 172

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Corometrics 172 and is the answer not in the manual?

GE Corometrics 172 Specifications

General IconGeneral
BrandGE
ModelCorometrics 172
CategoryMedical Equipment
LanguageEnglish

Related product manuals