EasyManua.ls Logo

GE eBike - Page 26

GE eBike
114 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 20 - eBike, eBike L, eBike EL 2018112-003 Rev J
B: Mechanical Design
l. Remove Strain Gauge and Prestress Spring
Refer to section E-3.2.1 for removal of the strain gauge.
Carefully loosen the strain gauge.
The retaining ball of the micro rope must not touch the rubber layer of the strain gauge (risk of
destruction).
Disconnect cable from J5 on PCB RPM.
Remove both hexagon socket screws of the strain gauge.
Loosen both hexagon socket screws of the prestress spring and remove spring.
Remove sealing varnish and take off both micro ropes.
m. Disassemble Control Terminal
Caution: Opening the control terminal will destroy the safety seal.
Therefore, the inspection of the BP measuring system may have to be repeated once
the control terminal has been opened.
Remove the control terminal from the ergometer.
Open control terminal (remove safety seal and loosen the 4 screws).
Take off bottom shell of the control terminal, then remove the electronic part that is
secured with 4 screws.
Pull out the control terminal panel.
Device with BP Functionality:
Lift off PCB BP by squeezing the plastic locking pins.
Remove cable ties.
Remove cable connecting PCB BP to PDB Display.
Disconnect air tubing.
When reassembling the control terminal, ensure proper positioning of cables and tubing.

Table of Contents

Related product manuals