3 Installation
Fraction Collector Frac-920 and Frac-950 is delivered in protective packing material and
shall be unpacked with great care.
Any equipment connected to Fraction Collector Frac-920 and Frac-950 must fulfill appli-
cable standards and local regulations.
For detailed information on Installation, see Fraction Collector Frac-920 and Frac-950
User Manuals.
3.1 Site requirements
RequirementParameter
Indoor useOperation site
Maximum 2000 mAltitude
100-240 V AC ±10%, 50-60 HzElectrical power
Overvoltage category IITransient overvoltages
4°C to 40°CAmbient temperature
Stable laboratory benchPlacement
20% to 95%, non-condensingHumidity
2Pollution degree
3.2 Transport
The equipment can be transported on a trolley capable of supporting at least 20 kg.
NOTICE
Always lift Fraction Collector Frac-920 and Frac-950 by the base
unit, never by the delivery arm, as this may damage the arm.
Before moving the system:
•
disconnect all cables and tubing connected to peripheral components and liquid
containers.
Frac-920 and Frac-950 Operating Instructions 28-9622-09 AC 25
3 Installation