38
06 Electrical Connection
User Manual V1.0-2023-10-30
BAT+
COM1
COM3
COM2
BAT-
BMS1
Battery system
When the nominal charge and discharge current of the single battery system is higher than
50A, the single battery system can be connected to BAT1+/- and BAT2+/- ports of the inverter�
The BMS communication cable should be connected to the BMS1 port as below�
BAT+
COM1
COM3
COM2
BAT-
BMS2
BAT2+
BAT2-
Battery system
When connecting a single battery system to BAT2+/- ports of the inverter, the BMS
communication cable should be connected to the BMS2 port as below�