EasyManua.ls Logo

GE GL 310 F3/4031 P/VR - Page 137

GE GL 310 F3/4031 P/VR
140 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SLOW OPERATION FOR MAINTENANCE PURPOSES
REV6 /REV3 OI 248 (EN) 137
140
Installing the Slow Operation Device
Place the support plate (17) of the slow operation device (15) on
the upper right spacer sleeve (18) and prop the device against the
mechanism housing.
Attach the hook (19) of the slow operation device to the pin (20) of
the support latch (24).
Removing Pressure from the Opening Latch
Turn the hexagon nut (22) clockwise using the tool until the
torque increases, i.e., until pressure is removed from the opening
latch (24).
17 Support plate 22 Hexagon nut
18 Spacer sleeve 23 Roller follower
19 Hook 24 Opening latch
20 Pin 25 Stop sleeve
21 Support latch
22
17
18
25
23
19
20
21
24

Table of Contents

Related product manuals