INSPECTION AND MAINTENANCE
REV6 /REV3 OI 248 (EN) 71
9.3.4 Checking the Gas Quality
Take a gas sample and check for compliance with the limits.
- Dew point: -5°C
1)
-SF
6
conten
t
: 97%
- Acidity (SO
2
): < 180 ppmv
2)
1) Based on the operating pressure and 20°C.
2) Measurements earliest perform three days after a short circuit.
The required measuring and testing equipment is listed in (see
“Tools and Auxiliary Equipment” on Page 109).
9.3.5 Checking the Contact Resistance
Check the contact resistance as described in the commissioning
section.
9.3.6 Checking the Operating Times
Check the operating times as described in the commissioning
section.
9.3.7 Checking the Threaded Connections
Check all accessible threaded connections (screwed or bolted
joints) to make sure they are tight.
The tightening torques are given in the following sections:
- Installation
- Commissioning
- Troubleshooting
- Reconditioning