EasyManua.ls Logo

GE GL 310 F3/4031 P/VR - Transport at the Installation Site

GE GL 310 F3/4031 P/VR
140 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HANDLING SULFUR HEXAFLUORIDE
16 OI 248 (EN) REV6 /REV3
3.3 Transport at the Installation Site
Pole columns are shipped at a gas gauge pressure of approxima-
tely 0.03 MPa (p
e
) (0.3 bar).
All pressure specifications are given in terms of relative pressure
(p
e
).
CAUTION
The bursting of pressurized parts such as insulators or bushings
may result in property damage or personal injury.
Therefore:
- Do not move pole columns if the gas gauge pressure is
higher than the shipping pressure.
DANGER

Table of Contents

Related product manuals