EasyManua.ls Logo

GE GL 310 F3/4031 P/VR - Page 139

GE GL 310 F3/4031 P/VR
140 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SLOW OPERATION FOR MAINTENANCE PURPOSES
REV6 /REV3 OI 248 (EN) 139
140
Opening Manually
Release the opening latch (24) using the manual opening release
(9).
At the same time, turn the nut (22) counterclockwise until the
support latch (21) of the roller follower (23) has passed the
opening latch (24).
Continue turning the nut (22) counterclockwise until the pressure
is removed from the hook (19).
At the end of this operation, the opening springs in the pole
columns and the mechanism are discharged and the breaker
position indicator indicates that the circuit breaker is open.
17 Support plate 22 Hexagon nut
18 Spacer sleeve 23 Roller follower
19 Hook 24 Opening latch
20 Pin 25 Stop sleeve
21 Support latch
22
17
18
25
23
19
20
21
24

Table of Contents

Related product manuals