RECONDITIONING
REV6 /REV6 OI 248 (EN) 93
Reassembly:
• Replace all O-rings and gaskets.
• Reverse the sequence to assemble the crankcase.
• Insert a new filter bag (see “Replacing the Adsorption filter”
on Page 89).
• Mount the interrupter chamber (see “Connecting the
Interrupter Chamber to the Post Insulator” on Page 87).
• Remount the pole column on the base frame.
• Re-commission the circuit breaker as described in the
commissioning section.
The following instructions must be followed when assembling
and installing the parts:
- Follow the specified lubrication procedure.
- Replace all seals and gaskets.
- Tighten the three screws (68) to a torque of 18Nm.
- Do not forget the filter sleeve (48).
- Do not install a new filter bag until right before evacuating the
assembled pole column.