EasyManua.ls Logo

GE SENOGRAPHE DMR+ - Chapter 1: Introduction; Section 1: Presentation; Section 2: Description

GE SENOGRAPHE DMR+
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ROOM REQUIREMENTS
GE Healthcare SENOGRAPHE DMR+
REV 1 pim 5128706–1–100
2–5
3–5 Line supply cable
The line supply cable comprises of two supply wires and a ground cable (i.e. 3 x AWG 10 (5.32
mm
2
)) with the following actual/usable lengths:
1+0 0)<+2 7 $ ,D-9
%/E0) 0)<+2 7 F $ ,-
%&
  +
3–5–1 Obtaining a line supply cable
D For customers in all countries except China, the optional line supply cable (S30331BC)
must be ordered from the Price Book so that it is supplied with the Senographe System.
D For customers in China, the optional line supply cable from GEMS must not be ordered.
Instead Chinese customers must locally order an equivalent CCC-certified supply cable
from their local electrical supplier.
3–6 Main circuit breaker
0 ONLY for GEMSE:
the Generic EDM is associated with an external modem (Motorola
3265) mounted on the EDM cabinet.
For GEMS A and GEMS AM the Generic EDM incorporates a modem board inside the
EDM cabinet. 2) $ 3*34+ E*)@)* / /4((0); E= +2) 34/+1$)* ; $4/+ E)
/G);  331*;3) 8+2 0130 *)<40+1/
Circuit breakers sizes for European market:
H*1$ 6 4( +1 " > 3*34+ E*)@)*>  7  $<)+3 7  '9
H*1$  4( +1 " > 3*34+ E*)@)*>  7 
$<)+3 7  '
Circuit breakers size and supply conductors for US market: refer to Section 517–71(a)
and Section 517–73(a) (Item 1, 2) of the NEC–1993 (see below).
2) E*32 3*34+ 4/); $4/+ E) *+);  1* 0)//

Other manuals for GE SENOGRAPHE DMR+

Related product manuals