EasyManua.ls Logo

GE SG Series

GE SG Series
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Critical Power
Modifications reserved
Page 45/46
GE_UPS_OPM_SGS_ISG_10K_40K_0US_V070.docx
Installation Guide SG Series 10-20-30-40 UL S
When the EPO - Emergency Power Off has been activated, the system must be restored as
follows:
Realize the push-button EPO - Emergency Power Off (contact on XB / 1, 4 is closed again).
Press the key O (Inverter OFF - Shut-down) on the Control Panel.
(see User Manual to Section 5.2).
In case of a Parallel System press the key “O” (Inverter OFF) on the Control Panel
of each unit connected on the Parallel Bus and having its output switch Q1
closed.

Related product manuals