8.1 Capacity regulator
Fig.22
CR 1
CR 2
ATTENTION Ifthecapacityregulatorisinstalledatthefactory,itissubsequently
installed and connected by the customer.
8| Accessories
CR 1
Deliverycondition1(fromthefactory):
Cylindercoverpreparedforcapacityregulator.
Fig.24
Before commissioning, the blind flange with
screwsmustberemovedandreplacedbythe
new set capacity regulator with O-ring joints
andscrews.Observepositionandconstruction
ofthecapacityregulator.
Attention! Compressor is under pressure!
Depressurize the compressor first.
Deliverycondition2(fromthefactory):
Connectcapacityregulatorinterminalboxor
switchcabinet.
Fig.23
Fig.25
HG44e HG56e