Installation and Operation
12 Installation and Users Manual for Mobile Link
®
Complete Unit Installation (New and Ret-
rofit)
1. Install end panel, controller, or sheet metal
controller cover. Install and tighten retain-
ing fasteners.
2. Verify generator is OFF.
3. Install generator controller fuse.
4. Install T1 fuse into transfer switch using an
appropriate fuse puller.
5. Turn main breaker in the home electrical
panel to ON. On generator control panel,
follow installation wizard and validate cor-
rect date, time, etc.
6. Place generator in AUTO.