Models FL3100/3101
iii
Periodic System Verification
The following system verifications should be performed at least annually:
Verify wiring, terminal connections and stability of mounting for all integral safety
equipment including, but not limited to:
Power supplies
Control modules
Field detection devices
Signaling / output devices
Accessories connected to field and signaling devices
Proper system operation should be verified by performing a full, functional test of
all component devices of the detection system, ensuring that the proper levels of
alarming occur.
Fault/Malfunction circuit operation should be verified.
Maintenance intervals should be independently established through a
documented procedure, including a maintenance log maintained by plant
personnel or third party testing services.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the General Monitors FL3100 and is the answer not in the manual?

General Monitors FL3100 Specifications

General IconGeneral
BrandGeneral Monitors
ModelFL3100
CategorySecurity Sensors
LanguageEnglish

Related product manuals