8. Instant Coffee: Press the (Edit) key to
access the screen as shown. Enter a value
for a stronger normal selection, e.g. 0.75 s.
Press the sequence 0-0-7-5 using the drink
selection keypad.
9. Press the (Edit) key to return to the Instant Coffee menu and verify that
the new timing value is displayed at the bottom of the screen.
N.B. When in this screen with the ingredient highlighted, pressing the
START/? key will run the ingredient motor for the programmed time, allowing
the engineer to collect and weigh the ingredient to determine gram throw if
required. This also applies to soluble ingredients in espresso machines.
10. F/B Coffee from Beans: Press the
(Edit) key to access the screen as shown.
Enter a value for a stronger normal
selection, e.g. 6.5 g. Press the sequence 0-
6-5 using the drink selection keypad.
11. Press the (Edit) key to return to the Coffee Bean menu and verify that
the new value is displayed at the bottom of the screen.
12. Adjust the other timers within the Instant Coffee/Fresh Coffee menu as
desired. These recipes also contain menus for Milk and Sugar timers. If
necessary adjust the timings for these ingredients. Once all timings have
been entered and verified, vend the selection to ensure that the new
recipe is satisfactory and that the cup does not under or over-fill.
13. Each drink selection available from the machine will be made up with
different selection timers, for example the Cappuccino recipe will contain
timers for Cappuccino Topping, Instant/Fresh Coffee and Sugar and will
also contain whipper timers which control how the selection is mixed and
presented in the cup.
14. Product, Whipper and Post Dispense Delays - these determine:
Product Delay - the time interval between the water valve start and the
start of the product ingredient motor.
Whipper Delay - the time interval between the water valve start and the
start of the product whipper motor.
N.B. The sugar whipper delay will always take precedent over the milk
whipper delay. If both are selected the total whipper run time will be the
sum of the sugar whipper and milk whipper run times.
Ingredi ent - 1
0-9 to Edit Value
Edit w hen Finish ed
06.5
Ingredi ent - 1
0-9 to Edit Value
Edit w hen Finish ed
00.75
Technical Manual
37

Table of Contents

Other manuals for Genesis Instant

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Genesis Instant and is the answer not in the manual?

Genesis Instant Specifications

General IconGeneral
BrandGenesis
ModelInstant
CategoryVending machines
LanguageEnglish