4. Swing the cup turret assembly back to its operating position. Ensure that
the unit is held securely by the magnetic catch.
5. Insert the safety key (a) supplied with the
machine into the door switch as shown. The
machine is now
oonn
. The water inlet valve will
open and the heater tank (instant & freshbrew
machines) will start to fill. The cup turret
mechanism will index the first available full cup
stack to the dispense position and drop the cup
stack into the cup drop mechanism. Fill the
remaining empty cup stack with cups.
6. While the machine is powering up, the
LCD will display the message as shown
opposite., indicating that the water in the
boiler is being heated.
7 Instant & Freshbrew Models: As the water heats, ensure that no water
overflows from the heater tank overflow pipe into the waste tray. Check
the system for leaks.
8. B2C Machines: On the initial setup the
message opposite is displayed on the LCD
screen. It indicates that the CoEx®
brewer has not been setup, only an
installation engineer can setup the CoEx®
brewer. If the CoEx® brewer has been
setup this message disappears after ten seconds.
As the machine initialises a small amount of water is pumped through the
system and is discharged into the waste tray. When the machine enters
standby mode remove the tray and empty the contents. Refit the waste
tray to the machine.
. Before using the B2C machine for the first time it is necessary to purge
the water system to ensure any water left in the system during transport
is dispensed. Press button 9 on the Service Keypad fitted inside the door
(see page 33). The machine will pump approximately 400ml of water
through the system which will be heated to operating temperature. Ensure
that a suitable container is placed under the dispense head. Remove the
container and empty the contents before proceeding.
Important: Should the machine fail to fill correctly or leak, turn off the
stopcock and the power to the machine before investigating the fault.
12
Operators Manual