Part No. 82799 Genie DPL Super Series 9
Operator’s ManualSecond Edition • First Printing
Pre-operation Inspection
Do Not Operate Unless:
You learn and practice the principles of safe
machine operation contained in this operator’s
manual.
1 Avoid hazardous situations.
2 Always perform a pre-operation
inspection.
Know and understand the pre-operation
inspection before going on to the next
section.
3 Always perform the function tests prior to use.
4 Inspect the workplace.
5 Only use the machine as it was intended.
Breather Cap - AC & DC
Models
Component damage will occur if the machine
is operated without a breather cap.
The first time this machine is
set up for use, the pipe plug in
the hydraulic reservoir, under the
battery cover, must be removed
and permanently replaced with a
breather cap.
A breather cap is supplied and
can be found in an envelope
taped to the mast.
Fundamentals
It is the responsibility of the operator to perform a
pre-operation inspection and routine maintenance.
The pre-operation inspection is a visual inspection
performed by the operator prior to each work shift.
The inspection is designed to discover if anything
is apparently wrong with a machine before the
operator performs the function tests.
The pre-operation inspection also serves to
determine if routine maintenance procedures are
required. Only routine maintenance items specified
in this manual may be performed by the operator.
Refer to the list on the next page and check each
of the items.
If damage or any unauthorized variation from
factory delivered condition is discovered, the
machine must be tagged and removed from
service.
Repairs to the machine may only be made by a
qualified service technician, according to the
manufacturer's specifications. After repairs are
completed, the operator must perform a
pre-operation inspection again before going on to
the function tests.
Scheduled maintenance inspections shall be
performed by qualified service technicians,
according to the manufacturer's specifications and
the requirements listed in the responsibilities
manual.

Other manuals for Genie DPL Super Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Genie DPL Super Series and is the answer not in the manual?

Genie DPL Super Series Specifications

General IconGeneral
BrandGenie
ModelDPL Super Series
CategoryLifting Systems
LanguageEnglish

Related product manuals