EasyManuals Logo

Genie DPL Super Series User Manual

Genie DPL Super Series
31 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #20 background imageLoading...
Page #20 background image
18 Genie DPL Super Series Part No. 82799
Operator’s Manual Second Edition • First Printing
Operating Instructions
Do Not Operate Unless:
You learn and practice the principles of safe
machine operation contained in this operator’s
manual.
1 Avoid hazardous situations.
2 Always perform a pre-operation
inspection.
3 Always perform function tests prior to use.
4 Inspect the workplace.
5 Only use the machine as it was
intended.
Fundamentals
The Operating Instructions section provides
instructions for each aspect of machine operation.
It is the operator's responsibility to follow all the
safety rules and instructions in the operator's,
safety and responsibilities manuals.
Using the machine for anything other than lifting
personnel, along with their tools and materials, to
an aerial work site is unsafe and dangerous.
Only trained and authorized personnel should be
permitted to operate a machine. If more than one
operator is expected to use a machine at different
times in the same work shift, they must all be
qualified operators and are all expected to follow all
safety rules and instructions in the operator's,
safety and responsibilities manuals. That means
every new operator should perform a pre-operation
inspection, function tests, and a workplace
inspection before using the machine.

Other manuals for Genie DPL Super Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Genie DPL Super Series and is the answer not in the manual?

Genie DPL Super Series Specifications

General IconGeneral
BrandGenie
ModelDPL Super Series
CategoryLifting Systems
LanguageEnglish

Related product manuals