EasyManua.ls Logo

Getinge Arjohuntleigh Ninjo Series - 2 Installation of Machine; General; Make Sure Assembly and Installation Work Is Carried out; Installation Order

Getinge Arjohuntleigh Ninjo Series
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
2 INSTALLATION OF MACHINE
2.1 General
2.1.1 Make sure assembly and installation work is carried out
WARNING!
To avoid the risk of back injury, this equipment
should be assembled and installed by at least two
people.
E\TXDOL¿HGSHUVRQQHO
in accordance with current local regulations and rules.
for indoor installation only.
not to be installed in wet locations.
2.1.2 Installation order
Carry out the installation in the following order:
1. Unpacking
2. Assembly
3. Connecting water
4. Connecting electric power
5. Installation inspection
2.1.3 Installation alternatives
The following installation alternatives exist:
Type (Designation) Possible positioning
Free-standing model
(FD1600, FD1610)
3ODFHGRQWKHÀRRUQH[WWRWKH
wall or attached to a wall.
Under-bench model
(FD1605, FD1615)
Under a bench or similar.

Related product manuals