EasyManua.ls Logo

Getinge Lucea 100

Getinge Lucea 100
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
Recording the inspection
SW Service Protocol PM OR Lights LUCEA 50 100-A
38 / 44
Lucea 50_100
01740 EN 01
2
www.getinge.com
Form:
STI-P01
-F11
-B-en
PN
Description
Qty
Replaced
Need
replacing
Pass
Fail
N/A
Lubrication of the suspension bushings
Lubrication of the Light head fork axles
Lubrication of the flat screen holder
Pass
Fail
N/A
Check the hold of the Ceiling cover, seal and silicone sleeve
Check the rigidity of the suspension by shaking
Check the verticality of the suspension tube (spirit level)
Check the hold of the suspension covers
Check the suspension fixing screws
(If screws appear loosened, replace them, do not retighten these screws during maintenance, it can lead to
breakage).
Check the bushing fixing screws
(If screws appear loosened, replace them, do not retighten these screws during maintenance, it can lead to
breakage).
Check the position and condition of spring arm snap ring
Check all other fixing screws
(Tighten them if necessary)
Check the hold of the spring arm covers and metal strips (Only double fork version)
Check the vertical stop of the spring arms (Only double fork version)

Other manuals for Getinge Lucea 100

Related product manuals