EasyManua.ls Logo

Glow-worm Economy Plus 60F - Preparation

Glow-worm Economy Plus 60F
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Supplied By www.heating spares.co Tel. 0161 620 6677
13
221504A
Diagram 5.3
WALL TEMPLATE
(Side and Rear)
SIDE FLUE
3286
5.2 Flue Preparation
All flue assemblies are designed for internal installation, given
that there is sufficient clearances opposite to the flue exit for
installation of the flue and the fixing of side panels.
If there are insufficient clearances the flues can be installed
externally from outside.
For a wall thickness up to 300mm, provided there is sufficient
space available, the flue can be fully installed from the inside.
For a wall thickness of over 300mm the external cut hole will
need to be made good from the outside.
5.3 Rear and Side Flue Application
Select the boiler location and flue application, with due regard
to the terminal position:
Take the template from the boiler pack and temporarily position
it on the wall, making sure that the minimum clearances are
maintained, see diagram 3.1.
Note: The template has “Fixture’s” alignment marks for ease of
installation.
For rear flue, mark the position of the flue as diagram 5.3.
For side flue, extend the centre line horizontally left or right to
the corner of the adjacent surface where the flue is required to
exit to outside. Mark the position of the centre of the flue, as
diagram 5.3
REAR FLUE
115mm
MINIMUM
HOLE
122mm
5 Preparation
FITTINGS PACK
INSTALATION
LITERATURE
USER
LITERATURE
BOILER
CARTON
TEMPLATE
Diagram 5.1
BOILER PACK CONTENTS
4796
5.1 Unpacking
Open the carton and check the items supplied against the list on
the flap, see diagram 5.1.
Place the boiler on one side, until required.

Related product manuals