EasyManuals Logo

Glow-worm MicraCom 24c-AS/1 Installation And Maintenance Instructions

Glow-worm MicraCom 24c-AS/1
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #12 background imageLoading...
Page #12 background image
6 Set-up
12 Installation and maintenance instructions MicraCom 0020289288_02
6.5.2 Terminal protection
A terminal guard is required if persons could come into con-
tact with the terminal or the terminal could be subject to dam-
age.
If a terminal guard is required, it must be positioned to
provide minimum of 50 mm clearance from any part of the
terminal and be central over the terminal.
The guard should be similar to that shown in the figure.

Table of Contents

Other manuals for Glow-worm MicraCom 24c-AS/1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Glow-worm MicraCom 24c-AS/1 and is the answer not in the manual?

Glow-worm MicraCom 24c-AS/1 Specifications

General IconGeneral
BrandGlow-worm
ModelMicraCom 24c-AS/1
CategoryBoiler
LanguageEnglish

Related product manuals