12
M5
1.2~2N·m
1
2
3
4
Connection Unit Introduction | Introducción de la unidad de conexión
(Optional) PE Cable | Cable PE (opcional)
You have to prepare the grounding terminal and the screw by yourselves.
Copper, 90°C, 4mm
2
L=L1+(1-2)mm L1
1. AC output terminal 2. PE (Gnd) Terminal 3. DC input terminal
[1]
4. Communication terminal 5.
Grounding busbar for equipment grounding
conductor(s) (EGC) from PV array structure(s)
[1]: GW50K-SMT-US: 5 MPPT inputs. GW60K-SMT-US: 6 MPPT inputs.
Conduit Hole Dimensions | Dimensiones de oricios de los conductos

Other manuals for Goodwe SMT Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Goodwe SMT Series and is the answer not in the manual?

Goodwe SMT Series Specifications

General IconGeneral
BrandGoodwe
ModelSMT Series
CategoryInverter
LanguageEnglish

Related product manuals