EasyManua.ls Logo

Goodwe SMT Series - Check and Storage; Pre-Receiving Inspection; Package Contents (Deliverables)

Goodwe SMT Series
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
M5
1.2~2N·m
1
2
3
4
Connection Unit Introduction | Introducción de la unidad de conexión
(Optional) PE Cable | Cable PE (opcional)
You have to prepare the grounding terminal and the screw by yourselves.
Copper, 90°C, 4mm
2
L=L1+(1-2)mm L1
1. AC output terminal 2. PE (Gnd) Terminal 3. DC input terminal
[1]
4. Communication terminal 5.
Grounding busbar for equipment grounding
conductor(s) (EGC) from PV array structure(s)
[1]: GW50K-SMT-US: 5 MPPT inputs. GW60K-SMT-US: 6 MPPT inputs.
Conduit Hole Dimensions | Dimensiones de oricios de los conductos

Other manuals for Goodwe SMT Series

Related product manuals