C O RNER PO ST # 1
C O RNER PO ST # 4
FRO NT O F PLAY SET
C O RNER PO ST # 2
C O RNER PO ST # 3
REA R C O RNER
PO STS WILL HA VE
A N EXTRA HO LE
A T THIS LO C A TIO N
3 X 3 X 96"
C O RNER PO ST
STEP 1: C O RNER PO ST LA YO UT
1: THIS STEP IS C RITIC A L TO BUILDING THE FO RT PRO PERLY. IF A NY MISTAKES A RE MADE HERE, YO U W ILL NEED TO
DIS-ASSEMBLE A ND THE RE-A SSEMBLE TO M A KE YO UR C O RREC TIO NS.
2: LAY O UT EA C H O F THE 3 X 3 X 96" C O RNER PO STS IN THE AREA YO U INTEND O N BUILDING THE FO RT SIDE O F THE
PLAYSET.
3: USE THE DIAG RAM BELO W TO C O RREC TLY IDENTIFY A ND O RIENT THE PO STS IN THE C O RREC T DIREC TIO N.
NO TE: THE SLIDE SIDE IS C O NSIDERED THE FRO NT O F THE PLA YSET WITH THE SW ING BEAM EXTENDING O FF TO THE
LEFT SIDE.