IRO N DUC TILE
BO LT C O VER
3/ 8" X 7" C A RRIAG E BO LT
TO RQ UE WASHER
3/ 8" W ASHER
3/ 8" LO C K NUT
4 X 6 X 96"SW ING BEAM
3/ 8" X 4-1/ 2" C A RRIAG E BO LT
3/ 8" W ASHER
IRO N DUC TILE
3/ 8" LO C K NUT
TO RQ UE WASHER
BO LT C O VER
4 X 4 X 73-1/ 2" TRAP A RM
STEP 17: IRO N DUC TILES
1: LINE UP THE HO LES O F THE IRO N DUC TILES WITH THE HO LES IN THE SWING BEAM.
2: FASTEN THE IRO N DUC TILES TO THE SWING BEAM USING 3/ 8" X 7" C A RRIA G E BO LTS WITH
TO RQ UE W A SHERS O N TO P O F THE SWING BEAM, A ND 3/ 8" WASHERS WITH 3/ 8" LO C K
NUTS O N THE BO TTO M. PLA C E BO LT C O VERS O VER EXPO SED THREADS AFTER SEC URING .
3: FASTEN IRO N DUC TILES TO THE TRAP ARM IN THE SAME MANNER THA T YO U FASTENED
THEM TO THE SWING BEAM, USING 3/ 8" X 4-1/ 2" C ARRIAG E BO LTS WITH TO RQ UE W A SHERS
O N TO P O F THE TRAP ARM, A ND 3/ 8" LO C KNUTS WITH 3/ 8" WASHERS O N THE BO TTO M.
PLA C E BO LT C A PS O VER A NY EXPO SED THREADS AFTER SEC URING .