STEP 7: A TTAC HING A RC H FA C E BO ARD A ND DEC K SUPPO RTS
1: THE 2 X 6 X 48" ARC H FA C E BO A RD (WITH FO UR PRE-DRILLED HO LES) A TTA C HES TO THE SET
O F HO LES BELO W THE TA RP SUPPO RT BO A RD. A TTA C H THE TO P A RC H FA C E BO ARD HO LES
USING 4" HEX BO LTS A ND 5/ 16" WA SHERS. PREDRILL 9/ 64" HO LES THRO UG H THE BO TTO M HO LE
2-1/ 2" DEEP INTO THE C O RNER PO ST. A TTA C H THE BO TTO M HO LES WITH 5/ 16 X 3-1/ 2" LA G
SC REW S A ND 5/ 16" WA SHERS.
2: THE 2 X 4 X 36" DEC K SUPPO RT BO A RDS (WITH TWO PRE-DRILLED HO LES) A TTA C H TO THE SET
O F HO LES ABO VE THE SA NDBO X BO A RDS O N THE INSIDE O F THE LEFT A ND RIG HT SIDE C O RNER
PO STS W ITH 4" HEX BO LTS A ND 5/ 16" W A SHERS.
O FFSET HO LES SHO ULD BE PO INTED DO WN O N BO TH DEC K SUPPO RT BO A RDS.
5/ 16" W ASHER
HEX BO LT
LAG SC REW
5/ 16" W ASHER
5/ 16 X 3-1/ 2"
4" HEX BO LT
A RC H FA C E BO A RD
2 X 6 X 48"
FRO NT O F PLAY SET
2 X 4 X 36"
DEC K SUPPO RT
(O FFSET DO W N)
5/ 16 X 4"
5/ 16" W ASHER