EasyManua.ls Logo

Graco EcoQuip EQ200T - Page 13

Graco EcoQuip EQ200T
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
13.TurntheselectorvalvetoFILL.
NOTE: NOTE:
NOTE:
Thewaterpumpshouldbegincycling.If
not,openthepotpressureregulatorenoughto
causethepumptorunat60cpm.
NOTE: NOTE:
NOTE:
Theautovent/purgevalvewillallowall
oftheairtrappedinthetopofthepottovent.
Whenairstopsventing,thepotpressuregauge
willstarttoregisterpressure.
14.Waitforpotpressuretoincrease.NOTE: NOTE:
NOTE:
It
cantakeuptoseveralminutesforthepotto
pressurize.
ti24824a
NOTE: NOTE:
NOTE:
Thepop-upcannotbepusheddown
unlessallofthepressureinthepotisreleased
byopeningthedumpvalve.
15.Setthepotpressure30psi(2.0Bar,0.2MPa)
higherthantheintendedblastpressure.Open
andclosethedumpvalveafterthepumpstalls.
Relievepotpressureto40psi(2.7Bar,0.27
MPa)beforeclosingthedumpvalve.Repeat
untilpotpressureisconsistent.
16.TurntheselectorvalvetoWASH.
17.Settheblastairpressure30psi(2.0Bar,0.2
MPa)lowerthanthepotpressurewhileblasting.
NOTE: NOTE:
NOTE:
Inordertoadjusttheblastpressure,
theblastcontrolswitchmustbeengaged.For
theinitialsetting,leavetheabrasiveballvalve
closed.
NOTE: NOTE:
NOTE:
Engageandreleasetheblastcontrol
switcheachtimetheblastregulatorisadjusted.
18.TurntheselectorvalvetoBLAST.
334666C 13

Related product manuals