EasyManua.ls Logo

Graco LineLazer IV 5900 - Setup Procedures

Graco LineLazer IV 5900
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Pressure Control
312195B 17
Pressure Control
On/Off Switch
Note: A complete wiring diagram is on page 34.
Removal
1. Relieve pressure, page 6.
2. F
IG. 13. Remove two screws (125) and cover (31).
3. Remove three screws (125) from control plate (15a).
Slide control plate out to access ON/OFF switch
(15g).
4. Press locking tab on ON/OFF switch connector (B)
and disconnect from control board.
5. Press in on two retaining tabs on each side of
ON/OFF switch and remove switch.
Installation
1. Install ON/OFF switch (15g) so tabs of switch snap
into place on inside of pressure control housing.
2. Connect ON/OFF switch connector (B) to J3 on con-
trol board.
3. Slide control plate (15a) back to original position
and secure with theree screws (125).
4. Install cover (31) with two screws (125).
FIG. 13
TO ENGINE
GROUND
Main Control
Box Cable
Transduser
15o
15r
15g
15n
15i
B
D
15j
31
216
217
125
15d
C
A
TI6408b
125
15a
15f

Other manuals for Graco LineLazer IV 5900

Related product manuals