EasyManua.ls Logo

Graco ThermoLazer ProMelt - Screed Box ThermoLazer 300 TC;ProMelt (SmartDie II); Installation of SmartDie II Screed Box; Removal of SmartDie II Screed Box

Graco ThermoLazer ProMelt
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Screed Box ThermoLazer 300TC/ProMelt (SmartDie II)
26 3A1319K
Screed Box ThermoLazer 300TC/ProMelt (SmartDie II)
Installation
1. Shut off screed box burners.
2. Slide screed box under screed shroud and press
down on screed box lever.
3. Engage screed box rod into screed box lever.
4. Align hole of rod clevis with connecting hole in
screed box yoke and install hairpin cotter pin.
5. Close and lock screed shroud door.
6. Re-light screed box burners as required (see
Screed Box Burner Lighting, page 21).
Removal
1. Shut off screed box burners.
2. Remove hairpin cotter pin connecting screed box to
rod clevis.
3. Press down screed box lever.
4. Disengage screed box rod from screed box lever
and carefully remove screed box.
Use extreme caution when installing and removing
screed box. Expect all equipment components and
material to be extremely hot. See MSDS for Thermo-
plastic Traffic Marking Compound.
ti16833a
ti16846a
ti14268a
ti17300a
ti16833a
ti17300a
ti16839a

Other manuals for Graco ThermoLazer ProMelt

Related product manuals