EasyManua.ls Logo

Gree GMV-120WM/B-F

Gree GMV-120WM/B-F
424 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GMV5 D.C INVERTER MULTI VRF SERVICE MANUAL
240
5. Install a new oil
separator.
Weld the four pipe joints with the oil
separator.
During welding, charge nitrogen into
the pipes. The pressure should be
controlled within 0.5±0.1 kgf/cm2
(relative pressure).
Note: Avoid nearby parts from being
burnt during welding.
●Screw the oil separator.
Tighten the electric heating belt.
6. Fix and wire the
electric box.
●Put the electric box back to original
position and screw it.
Connect all lines.
7. Check and install the
front panels.
●Check various parts and connecting
lines.
If no problem is found, hook the
front panels and tighten the screws.

Table of Contents

Other manuals for Gree GMV-120WM/B-F

Related product manuals