DC Inverter Multi 
VRF Service Manual
63
CONTROL
6.2.5 Connection between centralized controller and communication module
Connection of them is shown in gure 6.2.5.1
Power
 supply
Power
 supply
Power
 supply
Module 1
Module 2
Module 64
Connect to next module
Communication
wire
Air 
conditioner
Air 
conditioner
Air 
conditioner
Multi-VRF 
Centralized Controller
Communication
wire
Communication
wire
Fig.6.2.5.1 Skecth map of connection between centralized controller and communication module 
Note:
① .
Communication module’s address can be set from 1 to 64. In order to avoid communication malfunction, 
addresses can not be the same. 
② .
The communication wire of communication modules or centralized controller shall be equipped according to the 
distance in the project.  
③ .
Gree provides a piece of 2-core communication wire of 1m (the user shall extend the wire according to actual 
condition).
④ .
The centralized controller and the communication module are connected together through a communication line 
with a crystal connector at both ends. Close to the controller, a magnetic ring is needed on the communication line 
and is approximately 10cm away from the crystal connector after wrapped two circles by the communication line. 
During the installation, the magnetic ring should be put inside the electric control box after the crystal connector is 
connected with the smart zone controller. See the following gure for the connection manner and location.