EasyManua.ls Logo

Gree U-MATCH GUHD09NK3CO

Gree U-MATCH GUHD09NK3CO
264 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A/A DC INVERTER U-MATCH AIR CONDITIONERS INSTALLATION
77
2) Dimension of ceiling opening and location of the hoisting screw (M10)
(Hanging bolt position)
15-3/4"(400mm)
(□650mm)(Grille measurement)
□25-15/32"(650mm)
Hanging bolt position
23-27/32"(606mm)
2-19/32"(66mm)
17-5/16"(440mm)
GKH12K3CI
Figure 1-3-1
pe piantergirefR
)4(X
ewcrng sistoiH
)
dsorwer scngitsi honeewte bspaG
0(68
)
t unirndoo I
0(84
)
gnng openiileiC
0(89
)
dsarboacefrud setarcoeD
950(
)
sdare bocafd surtearcoeD
0(95
)
ingpeng oilinCe
(0*89
)
itnuordon I
(840
)
sdo rwe scrngtisi honeetw bepsGa
0(78
GKH18K3CI / GKH24K3CI / GKH30K3CI GKH36K3CI / GKH42K3CI
Figure 1-3-2
The drilling of holes in the ceiling must be done by the professional personnel.

Table of Contents

Related product manuals