EasyManua.ls Logo

Gree YX1FF - Major Component Disassembly

Gree YX1FF
77 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service Manual
Installation and Maintenance
71
Steps
Procedure
Screws
Flow Guide Loop
Screws
Screws
13.Remove Flow Guide Loop
Remove 3 screw on flow guide loop
and chassis, and three screws on
condenser, and then remove the flow
guide loop.
Condenser
4-way valve
Evaporator
Compressor
14.Remove condenser and evaporator
Remove the 3 screws fixing the
Evaporator; unsolder the welding joints
of the suction pipe, discharge pipe,
compressor, 4-way valve with the
condenser and evaporator, and then
remove the condenser and evaporator.
(before unsoldering, discharge the
refrigerant in the pipeline completely)

Table of Contents

Related product manuals