Greenline 33 94
Turn off switch 5 and switch 6 (48V hybrid switches).
Step 2:
Disconnect green connector from BMS by pulling on sides.
Step 3:
Disconnect positive cable from Tyco contactor and isolate it.
Step 4:
Disconnect negative cable from main ANL fuse and isolate it.
Step 5:
Disconnect the positive signal cable (for battery monitor) from Tyco and isolate it.
Step 6:
Disconnect temperature sensor (on ANL fuse).
Step 7:
Remove all cables (coming with cable bundle #7) from green BMS connector. The number of cables is not
constant (depending on boat packages), usually 5.
Remove these cables one by one! Mark them (cable with pin #)! Isolate them!
Step 8:
Unscrew the screws on the side of battery box (4x) and pull out the battery through a sofa. Use side handles to
lift the battery. The weight of the battery is 80kg, handle with care!