Requirements:
The AC cable is correctly connected.
The DC cable is correctly connected.
Step1: Please configure Safety follow the table below (Only for Australia, other
countries skip the first step):
Step2: Turn on the AC switch between the MTL-S inverter and the power grid.
Step3: Turn on the DC switch at the bottom of the MTL-S inverter, the inverter will
start automatically.
7.1 General LCD display
7.1.1 Power on display
When inverter powered on, LCD background will light automatically. Starting-up
display sequence, once the PV power is sufficient, inverter displays information as
shown in the flow chart as follow:
Module: xxxxxx
SerNo: xxxxxxxxxx
FW Version: x.x.x