• If the rail system can not be rated to the same max load as the hoist,
then extra brackets must be installed according to the Installation
guide (distance between bracket according to max load).
Class I equipment
Fixed rail systems are class I equipment and must be installed by a qualied
technician or by Guldmann Service Team.
Equipment is disconnected from Supply Mains by breaking the mains breaker
switch.
Class II equipment
Mobile equipment is class II epuipment (marked with double-encassed
symbol) and can be connected to the mains direct by the user.
Equipment is disconnected from Supply Mains by detaching the mains plug
from the wall outlet.
Emergency stop device
The emergency stop device must be reset in order to connect power to the
product. To do this, push the yellow reset button (see point 2.09).
1.07 Power supply
GH3 is equipped with batteries that require regular recharging. The power
supply for charging and the battery charging point must be connected by a
qualied engineer or by Guldmann Service Team.
The transformer supplied must always be used.
Safety concerning static electricity (ESD)
Service technicians and installers must use an ESD-safety package
consisting of a mat, a ground wire, and a bracelet. The technician/installer
connects the mat to a grounding point. The technician/installer must then
put on the bracelet and connect it to the mat. If it is not possible to nd a
grounding point, the mat and the bracelet must be used as a minimum.
Only then is it allowed to work with the PCB Board or components where it is
possible to come into contact with the PCB Board.