248
3. Installation of valve box
Use parts and components specied for installing the installation components.
Install the all thread rod, washers and nuts according to the instruction of the Fig.5
Be sure to follow the stipulations on products locally purchased to use nuts 3/8” of 3 pieces for 4 positions) and
washers on the upper and lower sides of the lifting tools.
<Note>
Be sure that the product must be installed with the top surface (the oblique surface in the Fig.5) upward, or it will
not work well and increase the working noise.
Nut
(purchased locally)
Valve box
Lifting bolt
(purchased locally)
Double nuts
(purchased locally)
10-15mm
Lifting tool
Gasket
(purchased locally)
Fig.5
Install the valve box in a level orientation.
Install the valve box in an orientation so that
the drain pipe side is higher may result in
water leak-age.
Drain
socket
With 1°
Valve box
Wrong
installation
Valve box
Drain
socket
Proper
installation
4. Refrigerant pipe Installation
Pipes between the outdoor unit and valve box, selection of refrigerant branching suite, and the Pipe between
refrigerant branching suites and the indoor units, please refer to the installation instructions or equipment design
data attached to the outdoor unit.
Before Installation, make sure the type of the refrigerant to be used is R410A. (If a refrigerant other than this type
is used, It cannot run properly)
Please provide thermal insulation at the high-pressure gas pipe, suction gas pipe,, liquid pipe and oil equalizing
pipe (pipes for outdoor units in case of multi-split system) and the connections between these pipes. In the
absence of thermal insulation, liquid leakage and scalding may happen. Particularly when the high-pressure
gas pipe delivers indrawn air under full-refrigeration condition, it needs the same thermal insulation as does the
suction gas pipe. Besides, high-pressure gas pipe and suction gas pipe are to deliver high-pressure gas, thus
please provide thermal insulation material that can sustain temperature over 120 °C.
Enhance the insulation material based on the installation environment. The indicators are shown below.
For RH75%–80% at 86°F (30°C): over 19/32” thick or more.
For over 80% at 86°F (30°C): over 25/32" thick or more.
The thermal insulation material surface is prone to condensation if not reinforced. Please refer to the equipment
design data for further details.