IMPORTANT NOTE
THESE INSTRUCTIONS MUST BE READ
AND UNDERSTOOD BEFORE INSTALLING,
COMMISSIONING, OPERATING OR
SERVICING EQUIPMENT
Sherborne Series Boilers
Room Sealed, Fully Modulating, Pre-Mix,
Gas Fired Boilers for Heating & Domestic
Hot Water Installations
Installation, Commissioning
and Servicing Instructions
SE 71c - FULLY CONDENSING
SE 64he - HIGH EFFICIENCY
NATURAL GAS I
2H
LPG-PROPANE I
3P
Question and Answer IconNeed help?

Do you have a question about the Hamworthy Sherborne SE71c and is the answer not in the manual?

Hamworthy Sherborne SE71c Specifications

General IconGeneral
BrandHamworthy
ModelSherborne SE71c
CategoryBoiler
LanguageEnglish

Summary

Important Safety Note

Introduction to Sherborne Boilers

Size and Space Requirements

Boiler Layout and Description

Site Location and Preparation

Site Location, Gas, and Water Supply

Requirements for site location, gas supply pressure, and water connections.

Flue System Requirements

Electrical Supply and Mounting

Electrical Supply Specifications and Safety

Details on voltage, fusing, wiring, and isolation for safe electrical connections.

Boiler Mounting Procedure

Step-by-step guide for mounting the boiler to a wall or frame.

Flue System Connections

Through Wall Horizontal Balanced Flue

Instructions for connecting a horizontal balanced flue terminal (80/125mm).

Extended Balanced Flue Connection

Guidelines for connecting extended horizontal or vertical balanced flues (100/150mm).

Room Sealed Flue Connections

System Types and Electrical Connections

Pre-Commissioning Checks

Gas, Ventilation, and Pipework Checks

Ensuring correct gas supply, ventilation, and pipework installation.

Flue and Electrical System Verification

Verifying flue system and electrical connections are correctly installed.

Boiler Checks Before Lighting

Gas System Leak Check Procedure

Procedure for checking for leaks in the appliance gas system using a manometer.

Pre-Lighting Checks and Settings

Essential checks including gas supply, ignition, sensors, and thermostat settings.

Initial Lighting and Safety Procedures

Lighting the Boiler and Flame Assessment

Steps for lighting the boiler, safety checks, and flame signal assessment.

Combustion Checks and User Handover

Performing Combustion Analysis

Procedure for checking and adjusting CO2 levels for optimal combustion.

Controls Operation Overview

Operating Modes and Information Access

Error Code Display and Fault Diagnosis

User Settings and Functions

Main Boiler Wiring Diagram

LMU Wiring Diagram

Fault Finding and Lockout Causes

Common Boiler Lockout Causes

List of potential causes for boiler lockout, including ignition and pressure issues.

Servicing Procedures

Annual Service and Preliminary Cleaning

Steps for annual servicing, including preliminary checks and cleaning.

Component Replacement Procedures

Main Control PCB Replacement