EasyManua.ls Logo

Harbor Breeze E-BDB52MBK5BC4N - Initial Installation

Harbor Breeze E-BDB52MBK5BC4N
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INITIAL INSTALLATION
7
G
Turn off circuit breakers and wall switch to the fan
supply line leads. (Fig. 1)
DANGER: Failure to disconnect power supply
prior to installation may result in serious injury or
death.
1.
2.
Check to make sure blades (G) are at least 30 in.
from any obstruction. Check downrod (A) length to
ensure blades (G) are at least 7 ft. above the floor.
(Fig. 3)
3.
ON
OFF
ON
OFF
1
2
Determine mounting method to use. (Fig. 2)
A. Downrod mount (normal or angled ceiling)
B. Closemount (normal ceiling only)
Important: If using the angle mount, check to
make sure the ceiling angle is not steeper than 19°.
A
B
7 ft.
min.
30 in.
min.
3

Other manuals for Harbor Breeze E-BDB52MBK5BC4N

Related product manuals